AGP Picks
View all

Road Closure Scheduled on U.S. Highway 16A in Keystone

For Immediate Release:
Monday, Sept. 28, 2026


Contact:
Isaac Schulz, Project Engineer, 605-981-5089

KEYSTONE, S.D. – Beginning Monday, Oct. 5, 2026, U.S. Highway 16A in Keystone will be closed at the intersection of U.S. Highway 16A and S.D. Highway 40 for a bridge replacement project. A detour for the closure will be provided.

Traffic will be controlled with temporary traffic signals during the closure. A 12-foot width restriction and 50-foot length restriction will be in place for the duration of the closure. Highway 16A is scheduled to be reopened by April 2027.

The primary contractor for this $2.2 million project is Complete Concrete Inc. of Rapid City, SD. The overall completion date is Friday, May 21, 2027.

Featured Project Page:
Find additional information, construction timelines, and project maps on the SDDOT website at https://dot.sd.gov/16a-keystone.

About SDDOT:
The mission of the South Dakota Department of Transportation is to provide a safe and efficient public transportation system.


For the latest on road and weather conditions, road closures, construction work zones, commercial vehicle restrictions, and traffic incidents, please visit https://sd511.org or dial 511.

Read more about the innovative work of the SDDOT at https://dot.sd.gov.

 

-30-

Legal Disclaimer:

EIN Presswire provides this news content "as is" without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the author above.

Share this page:

Advanced Search Options

Search for:

Search scope:

Type:

Search in:

Date range:

The last

Sort by:

Sign up for:

America Real Estate Online

The daily local news briefing you can trust. Every day. Subscribe now.

By signing up, you agree to our Terms & Conditions.